4443468234763399
25.08.2020 05:05

Язык 7 класс о. карпьюк. 7(а) страница(ы) - 169-170 — переведите текст, буду

Нажмите на рекламу ниже и сразу увидите ответ
Популярные вопросы:
Ответ:
Ангелмоямама
29.03.2023 00:50
1.the new theater is not built yet, right? 2.when will published your book? 3.these cards usually send birthday.4.the same melody played when i got home from work.5.your things packed in time? - yes,thank you.6.the house was in perfect order. everything was set, the floor is cleaned and the curtains washed.7.whose report is now being discussed? 8.nick had not seen.9.eat fruit before meals.10.we got to the theater, as tickets had been booked.21.quiet! the big news.2.how long to repair the apartment? 3.this was said especially for you.4.it will not cure if it does not go to the hospital.5.this pie is easy to prepare.6.i didn't think it was. - well, did you really watched? 7.was not lost for a single minute. had made all necessary preparations.8.the car is not painted. it has already dried.9.the name already chosen by that time, as the child was born? 10.i was afraid that the error will still be noticed
0,0(0 оценок)
Ответ:
lenadanilova77
17.12.2020 23:30
The first underground system was proposed by Charles Pearson in 1843. Twenty years later the first line of the London Underground was opened for traffic. In the early days, the trains were driven by steam locomotives, which burnt coal, filling the tunnels with smoke. It is said that the train staff and porters asked for a permission to grow beards and moustaches – as an early form of smog mask. The tunnels of the first underground were made as small as possible in order to reduce the construction costs. According to Pearson’s project, all lines were laid down close to the ground surface. The first escalator was also installed in theLondon Underground in 1911. The railways were prepared for any emergency that might occur. To minimize the danger of flooding the underground near the Thames, isolating doors were built in the tunnels. All the trains were equipped with special reduced lighting for using on open sections of track.
0,0(0 оценок)
Полный доступ
Позволит учиться лучше и быстрее. Неограниченный доступ к базе и ответам от экспертов и ai-bota Оформи подписку
logo
Начни делиться знаниями
Вход Регистрация
Что ты хочешь узнать?
Спроси ai-бота